Worli Sea Link Road. Package 2 covers a distance of 2.23 km from baroda palace near haji ali to the worli end of the bandra worli sea link. India’s 1st undersea tunnels to open in november.
Reduction in carbon monoxide and nitrogen oxide levels in mahim, dadar, prabhadevi and worli along existing roads. The first phase of the coastal road between worli and marine drive in south mumbai was inaugurated by chief minister eknath shinde.
Worli Seaface Witnessed A Huge Traffic Snarl With Several Motorists Vying With Each Other To Get Into The Road.
Reduced noise pollution in mahim, dadar, prabhadevi and worli along existing roads.
Package 2 Covers A Distance Of 2.23 Km From Baroda Palace Near Haji Ali To The Worli End Of The Bandra Worli Sea Link.
The first phase of mumbai’s ambitious coastal road, from marine drive to worli, will be operational by the end of january 2024, said maharashtra chief minister eknath shinde on saturday.
The Construction Of This Package Is Expected To Be Completed Within 48 Months (4 Years).
Images References
Reduction In Traffic On Existing Roads Because Of Traffic Diversion To The Sea Link.
The mumbai coastal road project (mcrp) is an ambitious project that aims to connect marine drive with the bandra worli sea link (bwsl), which laid its foundation stone in december 2018.
It Is The Longest Sea Bridge, As Well As The 5Th Longest Bridge In India After Mumbai Trans Harbour Link , Bhupen Hazarika Setu , Dibang River.
It is the longest sea bridge and the fourth longest bridge in india, spanning 5.6 km over the mahim bay.